1) Lean Manufacturing Case Study: 

  • Identified the 7 wastes of a diary industry and drew the current state map.
  • Implemented several lean manufacturing techniques including: 6s methodology, Kanban, heijunka, heijunka box, water spider, and milk runs.
  • Improved the whole manufacturing process and designed a new state map based on the lean manufacturing techniques that was implemented.

Lean Case Study.png

 

2) Planning and Scheduling the Construction of a Building: 

  • Developed a plan and scheduled the construction of the Phrem Civic Center at the Lebanese American University.
  • Planned the project construction using Primavera P6 and performed the following: Project breakdown and activity list formation, activity network and schedule development, and resource allocation and leveling.

planning-and-scheduling-the-construction-of-a-building